KB Guthrie Homes used second hand recycled timber posts, Waratah Tyeasy® Longlife Blue® wire, gripples and farm gates to complete this project.
The hardest aspects of the project were getting all the paddocks 100% lined up plus having to utilise the bent recycled posts.
The soil conditions were challenging due to old mining operations.
It took over twelve months to complete the 200km of fencing and 30 paddocks.